Barapullah Elevated Road Phase-3 dedicated to people
Home Minister and Minister of Cooperation Amit Shah inaugurated and laid the foundation stone on 29 Sept of various projects worth more than Rs.1,941 crore to strengthen connectivity in Delhi.
He dedicated the Barapullah Elevated Road Phase-3, built at a cost of Rs.1,635 crore, to the people of Delhi, the Home Ministry said.
In a post on X, Shri Amit Shah said, “To strengthen Delhi’s connectivity and make travel easier for Delhi residents, today various projects worth more than Rs.1,941 crore were inaugurated and had their foundation stones laid.
“The Barapullah Elevated Road Phase-3, built at a cost of Rs.1,635 crore, was dedicated to Delhi residents. This will provide signal-free connectivity between East and South Delhi, making commuting smoother, providing relief from traffic jams, and saving travel time. Additionally, the foundation stones for the Modi Mill-Savitri Cinema Flyover and Loni Underpass were also laid,” said the Minister. Fiinews.com









