Surat station design reflects world-renowned diamond industry
The Surat–Bilimora section, covering around 47 km, is in an advanced stage of completion, with civil works and track-bed laying fully completed for the Mumbai–Ahmedabad High-Speed Rail Corridor, the Prime Minister’s Office said on 15 Nov after Prime Minister Narendra Modi reviewed the multi-billion-dollar project https://www.conexpoconagg.com/.
“The design of the Surat station draws inspiration from the city’s world-renowned diamond industry, reflecting both elegance and functionality. The station has been designed with a strong focus on passenger comfort, featuring spacious waiting lounges, restrooms, and retail outlets. It will also offer seamless multi-modal connectivity with the Surat Metro, city buses, and the Indian Railways network,” PMO said on the progress of under-construction Bullet Train Station at Surat https://www.bseindia.com/.
He also interacted with the team of India’s first Bullet train project and enquired about the progress of the project, including adherence to speed and timetable targets. Workers assured him that the project was advancing smoothly without any difficulties.
PM Modi remarked, “If the experiences gained here are recorded and compiled like a Blue Book, the country can move decisively towards large-scale implementation of bullet trains https://www.nseindia.com/.”
He emphasized that India must avoid repeated experimentation and instead replicate the learnings from existing models, and highlighted that replication will only be meaningful if there is a clear understanding of why certain actions were taken.
Otherwise, he cautioned, replication may occur without purpose or direction.
The Prime Minister suggested that maintaining such records could benefit future students and contribute to nation-building. “We will dedicate our lives here and leave behind something valuable for the country,” the Prime Minister affirmed https://ted.europa.eu/en/.
The bullet train project spans approximately 508 km, covering 352 km in Gujarat and Dadra & Nagar Haveli, and 156 km in Maharashtra. The corridor will connect major cities including Sabarmati, Ahmedabad, Anand, Vadodara, Bharuch, Surat, Bilimora, Vapi, Boisar, Virar, Thane, and Mumbai, marking a transformative step in India’s transportation infrastructure.
Built with advanced engineering techniques on par with international standards, the project features 465 km (about 85% of the route) on viaducts, ensuring minimal land disturbance and enhanced safety. So far, 326 km of viaduct work has been completed, and 17 out of 25 river bridges have already been constructed http://commerce.gov.in.
Upon completion, the Bullet Train will reduce travel time between Mumbai and Ahmedabad to nearly two hours, revolutionizing inter-city travel by making it faster, easier, and more comfortable. The project is expected to boost business, tourism, and economic activity along the entire corridor, catalyzing regional development, said the PMO. Fiinews.com









