Tuesday, August 4, 2026
  • Home
  • About us
  • Privacy policy
  • Advertise with us
  • Contact us
Fii News Logo
No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • UP InternationalTrade Show
Newsletter
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • UP InternationalTrade Show
Fiinews
No Result
View All Result
Home Tenders

Tender: CCEA approves Mokama-Munger section

Fiinews by Fiinews
September 12, 2025
in Tenders
Reading Time: 2 mins read
A A
0
PIB

Mokama Munger Project.

0
SHARES
22
VIEWS
LinkedinShare on Twitter

Project to cost Rs.4,447.38cr

The Cabinet Committee on Economic Affairs (CCEA) has approved the construction of 4-lane greenfield access-controlled Mokama-Munger section of the Buxar-Bhagalpur High-Speed Corridor Bihar on Hybrid Annuity Mode (HAM) https://www.commerce.gov.in/.

The 82.4-km project will cost Rs.4,447.38 crore, the CCEA said on 10 Sept.

The section passes through or provides connectivity to important regional cities such as Mokama, Barahiya, Lakhisarai, Jamalpur, Munger connecting to Bhagalpur https://www.conexpoconagg.com/.

The Munger–Jamalpur-Bhagalpur belt in Eastern Bihar is emerging as a key industrial region focusing on ordinance factory (Existing gun factory and 1 more proposed as part of Ordnance Factory Corridor by Ministry of Defence), locomotive workshop (in Jamalpur), food processing (e.g., ITC in Munger) and related logistics & warehousing hubs https://www.bseindia.com/.

Bhagalpur stands out as a textile and logistics hub, led by Bhagalpuri silk (details of proposed textile ecosystem in Bhagalpur. Barahiya is emerging as a region for food packaging, processing and agro-warehousing. The increased economic activity in the region is expected to drive up the freight movement and the traffic on the Mokama-Munger section in the future https://ted.europa.eu/en/.

The 4-lane access-controlled corridor with close tolling, supporting average vehicular speeds of 80 km/h with design speed of 100 km/h will reduce the overall travel time to approximately 1.5 hours, while offering safer, faster, and uninterrupted connectivity for both passenger and freight vehicles https://www.nseindia.com/.

The proposed project with 82.40 km will generate about 14.83 lakh man-days of direct employment and 18.46 lakh man-days of indirect employment. The project will also induce additional employment opportunities due to increase in economic activity in the vicinity of the proposed corridor. Fiinews.com

Tags: CCEA
ShareTweetShare

Related Posts

Alstom
Tenders

Tender: Approved Danapur-Fatuha multitracking

by Fiinews
August 3, 2026
0
19

Direct Ludhiana-Jind rail link sanctioned The Indian Railways says the Rs.976 crore multitracking of the 29 km Danapur to Fatuha...

RailTrans 2027
Tenders

Tender: Visakhapatnam yard being remodelled

by Fiinews
August 2, 2026
0
17

Six additional platforms to be built, says Ministry Indian Railways has approved the Rs.299 crore remodelling of Visakhapatnam Coaching Yard...

Gas India

Tender: Rs.84,084cr exploration scheme approved

August 2, 2026
21
Global Solar Expo

Tender: Rs.5,070cr FSPV projects approved

August 2, 2026
21
BluPine Energy

Tender: BluPine in PPA talks for 70MW RE

July 31, 2026
23
Global Dam Watch

Tender: Rajya Sabha updated on Kosi-Mechi project

July 29, 2026
22
SBI YONO
Upits 2026 brochure 062026 pdf

POPULAR NEWS

  • Cristina Dnv

    Projects: Indian yards set to build green ships, says DNV expert

    0 shares
    Share 0 Tweet 0
  • Investment: India welcomes US investment and technology collaboration

    0 shares
    Share 0 Tweet 0
  • Market: PM Modi-President Zelenskyy discussed trade and technology

    0 shares
    Share 0 Tweet 0
  • Manufacturing: Approved ‘BioE3’of Biotechnology Dept

    0 shares
    Share 0 Tweet 0
  • Market: Indian-origin UGF scales heritage consumer brands globally

    0 shares
    Share 0 Tweet 0

Fiinews.com features through news articles on business opportunities in the Indian market for the benefits of foreigners. It is also a platform for international businesses to showcase through elaborate articles on their products & services to the Indian consumers and corporations exploiting industrialisation of the country.

7Clicks Media is a Singapore based Media & PR company offering over 100,000
impressions via our targeted communication strategy.

It is led by editor-in-chief Gurdip Singh who has worked over 45 years reporting on
Asian businesses.

Recent News

  • Invest: FinX launches Franklin Fund Olympiad
  • Market: Mintoak acquires Dubai’s ICC Loyalty
  • Project: India’s Holistic Education Purpose
  • Export: India-Uzbekistan urged to double trade
  • Invest: Wealth management opportunity highlighted

Pages

  • About US
  • ADVERTISE ON FIINEWS.COM
  • CONTACT US
  • EVENTS
  • FII-NEWS.COM PDF ARCHIVE
  • Home
  • News
  • PRIVACY POLICY

Subscribe to Newsletter

  • About
  • Advertise
  • Careers
  • Contact us

© 2024 FIINEWS - Design and developed by 7clicksmedia.

No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • UP International

© 2024 FIINEWS - Design and developed by 7clicksmedia.