Friday, October 2, 2026
  • Home
  • About us
  • Privacy policy
  • Advertise with us
  • Contact us
Fii News Logo
No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • UP InternationalTrade Show
Newsletter
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • UP InternationalTrade Show
Fiinews
No Result
View All Result
Home Projects

Tenders: Rooftop Solar installation procedure simplified

Fiinews by Fiinews
February 4, 2022
in Projects, Tenders
Reading Time: 3 mins read
A A
0
Tata Power

Tata Power's Rooftop Solar installation in Kerala.

0
SHARES
13
VIEWS
LinkedinShare on Twitter

RTS plant application to be online through national portal

The Ministry of New and Renewable Energy has issued simplified procedure for installation of Rooftop Solar (RTS) plant at residences by themselves or through any vendor of their choice under the Rooftop Solar Programme.

The new simplified procedure will be as follows:

A national portal for registering applications from the beneficiary, approval thereof and tracking progress will be developed. There will be a portal in the similar format at the every DISCOM level. Both the portals will be linked.

The household beneficiary will apply on the national portal to install RTS plant under the new mechanism. The beneficiary will be required to submit necessary information including details of bank account for payment of subsidy. At the time of application, the beneficiary will be informed about the complete process and subsidy amount that can be availed for installation of the RTS plant.

The application will be forwarded online to the concerned DISCOM for issuance of technical feasibility approval within next 15 working days. After the application is transferred to the DISCOM, it will also be displayed on the DISCOM portal.

After obtaining technical feasibility, the beneficiary will install the RTS plant from any vendor of his choice by selecting solar modules fulfilling the conditions of DCR and enlistment under ALMM and inverters which are certified by J3IS. The list of empaneled vendors will be provided on the portal.

In order to ensure quality and post installation services, MNRE will issue standards and specifications for RTS plant and a format of agreement to be executed between beneficiary and the vendor.

The agreement among other terms and conditions will have the provision to ensure that the RTS plant installed meets safety and performance standards and that the vendor would maintain the plant for next 5 years or higher period as per terms of the agreement.

The beneficiary has to install its plant within a specified period, otherwise his application will be cancelled and he has to re-apply for installation of RTS plant.

Upon installation of RTS plant, the beneficiary will apply for net-metering on the national portal, which will be forwarded online to the concerned DISCOM. The concerned

DISCOM will either procure and install the net-meter or it will advise the beneficiary to procure the net-meter as per prescribed specifications and get it tested from the

DISCOM authorized lab. The decision of the DISCOM will be posted on the portal.

After installation of the net-meter, the DISCOM officer will submit a commissioning and inspection report on the national portal, which will also be reflected on the DISCOM portal.

On receiving the inspection report, the subsidy will be released directly in the bank account of the beneficiary by the DISCOM.

The whole process will be monitored and a grievance redressal mechanism will be put in place.

It is expected that the national portal will be developed in about six to eight weeks. Till the national portal comes into operation, the existing procedure for availing subsidy for installation of rooftop solar plant through DISCOMs will continue and will be the only authorized procedure to avail subsidy from MNRE.

After the National portal set up, the beneficiary will have the choice of installing RTS availing either of the options.

The general public may be advised not to trust any misleading/spurious information being published on websites/social media particularly asking for registration fee or other payment for getting subsidy for installation of rooftop solar plants, the Ministry said on 2 Feb 2022. fiinews.com

Tags: Ministry of New and Renewable Energy
ShareTweetShare

Related Posts

RE India Expo
Projects

Project: Approved GEC-III to evacuate 135 GW

by Fiinews
October 2, 2026
0
16

Rs.186,405cr RE scheme to be set by FY 2032-33 The Cabinet has approved the Green Energy Corridor Phase-III (GEC-III) scheme...

Multi Nano Sense
Projects

Project: Multi Nano Sense gets Rs.37.51cr support

by Fiinews
October 1, 2026
0
18

Nagpur company to build indigenous multi-gas sensing platform The Technology Development Board (TDB), Department of Science & Technology (DST), has...

PIB

Project: India-Korea defence talks held in Delhi

October 1, 2026
18
Bharat Buildcon

Project: Delhi gets connectivity projects

October 1, 2026
16
Ministry of Railways

Tender: Kavach 4.0 approved for Varanasi division

September 30, 2026
17
PIB

Project: Trishna to be launched in 2027

September 30, 2026
20
SBI YONO
Upits 2026 brochure 062026 pdf

POPULAR NEWS

  • Cristina Dnv

    Projects: Indian yards set to build green ships, says DNV expert

    0 shares
    Share 0 Tweet 0
  • Investment: India welcomes US investment and technology collaboration

    0 shares
    Share 0 Tweet 0
  • Market: PM Modi-President Zelenskyy discussed trade and technology

    0 shares
    Share 0 Tweet 0
  • Manufacturing: Approved ‘BioE3’of Biotechnology Dept

    0 shares
    Share 0 Tweet 0
  • Wipro emerges leader in Everest’s MatrixTM 2018

    0 shares
    Share 0 Tweet 0

Fiinews.com features through news articles on business opportunities in the Indian market for the benefits of foreigners. It is also a platform for international businesses to showcase through elaborate articles on their products & services to the Indian consumers and corporations exploiting industrialisation of the country.

7Clicks Media is a Singapore based Media & PR company offering over 100,000
impressions via our targeted communication strategy.

It is led by editor-in-chief Gurdip Singh who has worked over 45 years reporting on
Asian businesses.

Recent News

  • Tech: Services Xpress launched in South India
  • Market: Global South impacted by food crises
  • Market: Minister highlights energy policies
  • Manufacture: Fenner-Yamada to produce components
  • Export: AM Green to supply ammonia to Germany

Pages

  • About US
  • ADVERTISE ON FIINEWS.COM
  • CONTACT US
  • EVENTS
  • FII-NEWS.COM PDF ARCHIVE
  • Home
  • News
  • PRIVACY POLICY

Subscribe to Newsletter

  • About
  • Advertise
  • Careers
  • Contact us

© 2024 FIINEWS - Design and developed by 7clicksmedia.

No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • UP International

© 2024 FIINEWS - Design and developed by 7clicksmedia.