Sunday, December 21, 2025
  • Home
  • About us
  • Privacy policy
  • Advertise with us
  • Contact us
Fii News Logo
No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
Newsletter
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
Fiinews
No Result
View All Result
Home Tenders

Tenders: 609,591 MW installed capacity likely in India during 2026-27

Fiinews by Fiinews
June 2, 2023
in Tenders
Reading Time: 3 mins read
A A
0
POWERGRID Corp of India Ltd
0
SHARES
10
VIEWS
LinkedinShare on Twitter

Likely Installed Capacity for 2031-32 is estimated to be 900,422 MW, says Ministry

India is likely to have Installed Capacity of 609,591 MW during 2026-27, according to the Central Electricity Authority’s (CEA) notified National Electricity Plan (NEP) (Vol-I Generation) for the period of 2022-32.

The 2026-27 installed capacity would comprise of 273,038 MW of Conventional capacity (Coal-235,133MW, Gas–24,824MW, Nuclear-13,080MW) and 336,553 MW of Renewable based Capacity (Large Hydro-52,446 MW, Solar-185,566 MW Wind-72,895 MW, Small Hydro-5,200 MW, Biomass-13,000MW, Pump Storage Plants (PSP projects) -7446MW) along with BESS capacity (Battery Energy Storage System) of 8,680MW/34,720 MWh.

The likely Installed Capacity for the year 2031-32 is estimated to be 900,422 MW comprising of 304,147 MW of Conventional capacity (Coal-259,643 MW, Gas–24,824MW, Nuclear-19,680MW) and 596,275MW of Renewable based Capacity (Large Hydro-62,178 MW, Solar-364,566MW, Wind-121,895MW, Small Hydro-5450MW, Biomass-15,500 MW, PSP-26,686MW; excluding 5856 MW of likely Hydro based Imports) along with BESS capacity of 47,244MW/236,220MWh.

The projection of total capacity addition is in line with the target of the country to achieve a non-fossil based installed capacity of around 500 GW by the year 2029-30, Power Ministry said in a release on 31 May 2023.

The NEP envisages that the share of non-fossil-based capacity is likely to increase to 57.4% by the end of 2026-27 and may likely to further increase to 68.4% by the end of 2031-32 from around 42.5% as on April’2023.

The average Plant Load Factor (PLF) of the total Installed coal capacity of 235.1 GW is likely to be about 58.4% in 2026-27and that of 259.6 GW of coal-based capacity is likely to be about 58.7 % in 2031-32.

As per the NEP projections, the energy storage capacity of 16.13 GW/82.37 GWh with PSP based storage of 7.45GW capacity and 47.65 GWh storage and BESS based storage of 8.68 GW/ 34.72 GWh is required by the year 2026-27. The storage capacity requirement increases to 73.93 GW (26.69 GW PSP and 47.24 GW BESS) with storage of 411.4 GWh (175.18 GWh from PSP and 236.22 GWh from BESS) by the year 2031-32.

The domestic coal requirement has been estimated to be 866.4 million tonnes for the year 2026-27 and 1,025.8 million tonnes for the year 2031-32 and estimated requirement of 28.9 MT of coal imports for the plants designed to run on imported coal.

The total fund requirement for generation capacity addition for the period 2022-2027 is estimated to be Rs.14,54,188 crores and for the period 2027-2032 has been estimated to be Rs.19,06,406 crores.

The estimate of fund requirement for 2027-32 does not include advance action for the projects which may get commissioned after 31 Mar 2032, said the Ministry.

The average emission factor is expected to reduce to 0.548 kg CO2/kWhnet in the year 2026-27 and to 0.430 kg CO2/kWhnet by the end of 2031-32.

As per section 3(4) of the Electricity Act, 2003, Central Electricity Authority has been mandated to prepare a National Electricity Plan (NEP) in accordance with the National Electricity Policy and notify such plan once in five years.

According to the NEP document, the projected All India peak electricity demand and electrical energy requirement is 277.2 GW and 1907.8 BU for the year 2026-27 and 366.4 GW and 2473.8 BU for the year 2031-32 as per 20th Electric Power Survey (EPS) Demand projections.

The Energy Requirement & Peak Demand are inclusive of the impact due to increased adoption of Electric Vehicles, Installation of Solar roof tops, Production of Green hydrogen, Saubhagya scheme etc.

The plan document, which was released today via e-Gazette, includes the review of the last five years (2017-22), a detailed plan for the next five years (2022-27) and the prospective plan for the next five years (2027-32). fiinews.com

Tags: Ministry of Power
ShareTweetShare

Related Posts

Mumbai metro
Tenders

Tender: Rail network to improve in suburb Mumbai

by Fiinews
December 21, 2025
0
15

Acquisition has been completed for bullet train To improve the capacity of rail network in Mumbai suburban area, Mumbai Urban...

IREPS
Tenders

Tenders: NPG evaluates 7 rail-1 road projects

by Fiinews
December 21, 2025
0
17

Upgradation of NH-544D from Vinukonda-Guntur evaluated The 105th meeting of the Network Planning Group (NPG) under the PM GatiShakti National...

PIB

Tender: Rs.887cr approved for Mumbai Marina

December 20, 2025
13
Sirajholding

Tender: Tamil Nadu to get 100 MW green data centre

December 19, 2025
14
Renew

Tender: ReNew-Google sign Rajasthan project pact

December 18, 2025
27
Chennai Metro

Tender: India-ADB sign US$2.2bn loans for projects

December 17, 2025
12
SBI YONO

POPULAR NEWS

  • Cristina Dnv

    Projects: Indian yards set to build green ships, says DNV expert

    0 shares
    Share 0 Tweet 0
  • Market: Indian-origin UGF scales heritage consumer brands globally

    0 shares
    Share 0 Tweet 0
  • Technologies: Royal Diamond sponsors aerspace Industries’ drones in UAE

    0 shares
    Share 0 Tweet 0
  • Investments: Foreign investors see India as long-term destination for fund placings

    0 shares
    Share 0 Tweet 0
  • Markets: Blue Dart maintains positive outlook on India

    0 shares
    Share 0 Tweet 0

Fiinews.com features through news articles on business opportunities in the Indian market for the benefits of foreigners. It is also a platform for international businesses to showcase through elaborate articles on their products & services to the Indian consumers and corporations exploiting industrialisation of the country.

7Clicks Media is a Singapore based Media & PR company offering over 100,000
impressions via our targeted communication strategy.

It is led by editor-in-chief Gurdip Singh who has worked over 45 years reporting on
Asian businesses.

Recent News

  • Tender: Rail network to improve in suburb Mumbai
  • Manufacturing: TDB supports Sodium-Ion project
  • Export: JTIC to strengthen bilateral trade
  • Tenders: NPG evaluates 7 rail-1 road projects
  • Market: Singapore has long-term intent on India

Pages

  • About US
  • ADVERTISE ON FIINEWS.COM
  • CONTACT US
  • EVENTS
  • FII-NEWS.COM PDF ARCHIVE
  • Home
  • News
  • PRIVACY POLICY

Subscribe to Newsletter

  • About
  • Advertise
  • Careers
  • Contact us

© 2024 FIINEWS - Design and developed by 7clicksmedia.

No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports

© 2024 FIINEWS - Design and developed by 7clicksmedia.