Projects for economic growth in the state
Minister for Road Transport, Highways Nitin Gadkari will lay foundation stone of and inaugurate 35 highway projects in Madhya Pradesh on 25 of August 2020.
These projects for inauguration and foundation laying carry a Road length of 1,139-km, involving construction value of over Rs.9,404.05 crore.
Paving the way for the development of MP, these roads will enhance better connectivity, convenience and economic growth in the State.
1. Construction of 4-lane ROB at km 14+800 (Jerai) on Katin -Beena section of NH-934 on EPC Mode under setu Bharatam Road Over Bridge (ROB) Rs..77.26 crore
2. Construction of 2 -lane ROB at Km 36+800 (Jarua) on Sagar -Khuraj-Bina section of NH-934 on EPC Mode under Setu Bharatam ROB Rs.66.49 crore
3. Construction of Major Bridge at Betwa River (436 mtr) at km. 81/2 on NH-539 on EPC mode Bridge Rs.24.66 crore
4. Construction of High-level Bridge across Kshipra River at Km 20/2 on Indore Betul section of NH-47 on EPC Mode Bridge Rs.9.36 crore
5. Reconstruction of 6 nos. submersible, narrow, distress bridges on Jabalpur-Dinori section of NH-45 Ext. on EPC Mode. Bridge Rs.26.02 crore
6. Strengthening work in km. 1/550 to 23 of Indore-Betul Road on NH-47 22.6-km Rs.14.03 crore
7. Strengthening work in km. 32 to 35 of Ambua to Dahod on NH-56 4-km Rs.2.58 crore
8. Strengthening work in km. 41 to 55 of Gulganj-AmanganjPawai-Katni Road on NH-43 Ext 15-km Rs.6.58 crore
9. Strengthening work in km. 82=1, 101 to 103=3, 106=1, 112=1, 120 to 122=3, 124 to 134=11, 135 to 145= 11, 163 to 164=2, 167= 1, 182 to 183=2, 188= 1, & 220 to 222.400=3.400 ( Tikamgarh- Prathvipur – Orchha Road) on NH-539 40.4-km Rs.16.73 crore
10. Strengthening work in km. 1, 2, 5 to 10, 13,14,18,20,26 to 33, 77 to 85, 96 to 98, 162 to 195 of Dinara- Pichhor Road on NH-346 68-km Rs.33.27 crore
11. Strengthening work in km.115, 122, 127, 128, 136 to 148, 159, 182, 183, 188, 201 of Sawai Madhopur-Sheopur-GorasShyampur Road on NH-552 Extn. 22-km Rs.11.02 crore
12. 4L of Nanasa to Pidgaon from Km 95.000 to 142.445 of Indore – Harda Section of NH-47 47.445-km Rs.866.64 crore
13. 4L of Harda to Temgaon from Km 0.000 to 30.000 of Harda-Betul Section of NH-47 30-km Rs.555 crore
14 4L of Chicholi to Belul from km 81.00 to km 121.248 of-km Harda-Betul section of NH-47 40.25-km Rs.620.36 crore
15 4-laning of Katni Bypass section of NH-30 20-km Rs.194.4 crore
16 2L+PS from Km 81 to 175 of Sanchi-Sagarsection of NH146 on EPC mode 94.64-km Rs.287.34 crore
17 2L+PS from Km 0.00 to 36.71 of Rewa-Sirmoursection of NH-135B on EPC mode 36.71-km Rs.162.56 crore
18 Construction of HL Bridges at Km. 188/4 onChattarpur-UP Borader section of NH-34 on EPC mode Bridge Rs.8.58 crore
19 Const. of High-level Bridge overDhasan river at Km. 146/8-10 of Bhopal-Sanchi-Sagar section of NH-146 on EPC Mode. Bridge Rs.16.68 crore
20 Reconstruction of 29 nos. Culverts and Minor bridges between Km. 3/8 to 87 Sagar- Chattarpur–MP/UP Border section of NH-34 Bridge Rs.39.73 crore
21 2L+PS from Km 131 to 189/4 of Sagar-Chattarpursection of NH-34 on EPC mode. 57.42-km Rs.178.23 crore
22 2L+ PS from Km 5.500 to Km 22.910 (KhilchipurJirapur section of newly declared NH-752 B on EPC mode 25.18-km Rs.101.61 crore
23 Strengthening work in km. 0 to 3200 BiaoraMaksudangarh Road on New NH 752 B 3.2-km Rs.1.64 crore
24 Strengthening work in km. 34.560 to 36 of Anjad -Thikari Road on NH-347B 1.44-km Rs.0.91 crore
25 Strengthening work in km.20 to 22 of (Jabalpur-KundumShahpura-Dindori Road) & Km. 194, 195, 219, 220 of SagarTola-Kabirchabutra stretch on NH- 45 Extn. 7.6-km Rs.3.31 crore
26 4L of Rewa to Maihar section of NH-30 (Package-I) 69.19-km Rs. 622 crore
27 4L of Maihar to Katni and Katni to Sleemnabad section of NH-30 (Package-II) 69.07-km Rs.622 crore
28 4L of Sleemnabad to Jabalpur section of NH-30 (PackageIV) 68.26-km Rs.810.22 crore
29 4L of Jabalpur-Lakhnadon section of NH-30 & NH-34 80.82-km Rs.928.83 crore
30 4L of Biaora–Pachore-Sarangpur-Shajapur-Makshi-Dewas Section of NH-52 141.26-km Rs.1,583.79 crore
31 4L of Lalghati to Mubarakpur (Pkg-I) of Bhopal-Biaora Section of NH-46 8.275-km Rs.221.88 crore
32 Balance work of 2 L+PS of Bhopal-SanchiSection of NH-146 53.775-km Rs.167.2 crore
33 4L of Nayagaon to Satanwardaof Gwalior-Shivpuri Section of NH-46 97-km Rs.1,055 crore
34 4L of existing road from km 169/6 to km 173/ 6 (Mohana Town Portion) of Gwalior- Shivpuri Section of NH-46 on EPC mode (Under One Time Investment ) 3.2-km Rs.18.39 crore
35 4L of existing road from SimariyaTekri to HaripuraTiraha road from Km. 41/8 to Km. 50/10 of NH-44 at Dabra Town and JaurasiMandir approach Road from Km. 22/4 to Km. 23/6 of NH-44 on EPC mode 10.3-km Rs.49.75 crore
Total 1,137.035-km Rs.9,404.05 crore.
#tenders #projects #construction #infrastructure /fiinews.com