Saturday, March 14, 2026
  • Home
  • About us
  • Privacy policy
  • Advertise with us
  • Contact us
Fii News Logo
No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
Newsletter
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
Fiinews
No Result
View All Result
Home Tenders

Tender: Overwhelming response to Kaliabor-Numaligarh Section

Fiinews by Fiinews
March 14, 2026
in Tenders
Reading Time: 2 mins read
A A
0
NHAI
0
SHARES
14
VIEWS
LinkedinShare on Twitter

18 bids received for Rs.6,956cr project

The National Highways Authority of India (NHAI) has received an overwhelming response from bidders for the construction of the over 85 km long Kaliabor to Numaligarh section of NH-715, passing through Kaziranga National Park and Tiger Reserve, on Engineering, Procurement and Construction (EPC) mode https://www.conexpoconagg.com/.

In response to the bids invited by NHAI from highway developers, the project has received 18 bids and is scheduled to be awarded in the current financial year at a total capital cost of Rs.6,956 crore.

The project also includes construction of a 34.5 km long Kaziranga Elevated Corridor for free and uninterrupted passage of wildlife. The elevated corridor will be implemented in three sections of 18.3 km, 11.2 km and 5 km, respectively https://www.bseindia.com/.

The alignment of the corridor is designed to facilitate movement of wildlife from Kaziranga National Park to the Karbi Anglong hills and will be constructed as part of the upgradation of NH-715 from 2-lane to 4-lane configuration https://www.nseindia.com/.

The 85.6 km long project includes development of two Greenfield bypasses with a combined length of 21 km at Jakhlabandha (Nagaon) and Bokakhat (Golaghat) town areas, one major bridge, 20 minor bridges, seven flyovers, 84 culverts, one railway overbridge (ROB), five vehicular underpasses (VUP), 12 light vehicular underpasses (LVUP), 21 bus shelters and 16 km long service roads.

In order to align the project as per wildlife requirements, NHAI has consulted the Wildlife Institute of India (WII), National Tiger Conservation Authority (NTCA) and the Forest Department, Government of Assam, and has received approvals from the National Board for Wildlife (NBWL). The elevated design has been planned to minimise disturbance to natural habitats while ensuring smoother and safer vehicular movement along this critical route.

Upon completion, the Kaliabor–Numaligarh section of NH-715 will play a pivotal role in regional economic growth by strengthening connectivity between major tourism, industrial and economic centres, boosting tourism to Kaziranga National Park, and opening new avenues for trade and industrial development in Assam, the Ministry of Road Transport and Highways said on 13 Mar. fiinews.com

Tags: MoRTH
ShareTweetShare

Related Posts

PIB
Tenders

Tender: PM sees potential of Assam’s energy sector

by Fiinews
March 14, 2026
0
13

Lower Kopili Hydro Power Project will benefit North East. Prime Minister Narendra Modi has inaugurated and laid foundation stones for...

Rahsta Expo
Tenders

Tender: NHAI awards bypass contract in TN

by Fiinews
March 13, 2026
0
11

Project will reduce travel time to Aranganatha Swamy Temple and Nataraja Temple NHAI has issued Letter of Award (LOA) for...

Pm officiates projects in tamil nadu

Tender: PM officiates on Rs.16,650cr projects

March 12, 2026
14
7th Rail Metrotech Expo India 2026.

Tender: Rs.4,474cr approved for 2 rail projects

March 12, 2026
16
PIB

Tender: Cabinet approves MP section of NH-752D

March 12, 2026
20
PIB

Tender: Revised cost approved for Noida project

March 12, 2026
16
SBI YONO

POPULAR NEWS

  • Cristina Dnv

    Projects: Indian yards set to build green ships, says DNV expert

    0 shares
    Share 0 Tweet 0
  • Market: Indian-origin UGF scales heritage consumer brands globally

    0 shares
    Share 0 Tweet 0
  • Technologies: Royal Diamond sponsors aerspace Industries’ drones in UAE

    0 shares
    Share 0 Tweet 0
  • Investments: Foreign investors see India as long-term destination for fund placings

    0 shares
    Share 0 Tweet 0
  • Markets: Blue Dart maintains positive outlook on India

    0 shares
    Share 0 Tweet 0

Fiinews.com features through news articles on business opportunities in the Indian market for the benefits of foreigners. It is also a platform for international businesses to showcase through elaborate articles on their products & services to the Indian consumers and corporations exploiting industrialisation of the country.

7Clicks Media is a Singapore based Media & PR company offering over 100,000
impressions via our targeted communication strategy.

It is led by editor-in-chief Gurdip Singh who has worked over 45 years reporting on
Asian businesses.

Recent News

  • Tech: DST supports Indo-Singapore collaboration
  • Tender: Overwhelming response to Kaliabor-Numaligarh Section
  • Tender: PM sees potential of Assam’s energy sector
  • Tech: Refroid-Technavious “Brick-to-Chip” strategy
  • Tech: India works on 6G through studies with ITU

Pages

  • About US
  • ADVERTISE ON FIINEWS.COM
  • CONTACT US
  • EVENTS
  • FII-NEWS.COM PDF ARCHIVE
  • Home
  • News
  • PRIVACY POLICY

Subscribe to Newsletter

  • About
  • Advertise
  • Careers
  • Contact us

© 2024 FIINEWS - Design and developed by 7clicksmedia.

No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports

© 2024 FIINEWS - Design and developed by 7clicksmedia.