Monday, January 12, 2026
  • Home
  • About us
  • Privacy policy
  • Advertise with us
  • Contact us
Fii News Logo
No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
Newsletter
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
Fiinews
No Result
View All Result
Home Projects

Project: NHAI’s Guiness World Records on NH-544G

Fiinews by Fiinews
January 12, 2026
in Projects
Reading Time: 3 mins read
A A
0
Rajpath
0
SHARES
16
VIEWS
LinkedinShare on Twitter

IIT Bombay-OEMs ensured highest standards of quality and safety

Highlighting its engineering prowess and execution excellence, NHAI in a landmark achievement has successfully created four Guinness World Records on the under-implementation Bengaluru–Kadapa–Vijayawada Economic Corridor of NH-544G, the Ministry of Road Transport & Highways said on 11 Jan.

NHAI in association with concessionaire Rajpath Infracon Private Limited successfully created four Guinness World Records:

Record for the longest continuous laying of Bituminous Concrete, covering 28.89 lane km in 24 hours;

Record for continuous laying of highest quantity of 10,655 metric tons Bituminous Concrete in 24 hours;

Record for continuous laying of 57,500 metric tons of Bituminous Concrete;

Record for continuous paving of 156 lane km.

On 6 Jan 2026, NHAI made two Guinness World Records near Puttaparthi, Andhra Pradesh. First, was the record for the longest continuous laying of Bituminous Concrete, covering 28.89 lane km or 3-lane wide 9.63 km long section within 24 hours. The second record was created for continuous laying of highest quantity of 10,655 metric tons Bituminous Concrete in 24 hours. Both records were established for the first time globally under the six-lane National Highway project on the Bengaluru–Kadapa–Vijayawada Economic Corridor https://www.bseindia.com/.

Building further on this momentum, two additional Guinness World Records were created on 11th January 2026. These include the continuous laying of 57,500 metric tons of Bituminous Concrete and a record for continuous paving of 156 lane km or 3-lane wide 52 km long section, surpassing the previous world record of 84.4 lane km or 2-lane wide 42.2 km long section. These record-setting feats was executed across Package-2 and Package-3 of the Bengaluru–Kadapa–Vijayawada Economic Corridor.

NHAI and Rajpath Infracon Private Limited achieved this historic feat through deployment of state-of-the-art construction equipment and machinery involving 70 tippers, five hot mix plants, one paver, and 17 rollers. Supported by stringent quality assurance mechanisms, the process was monitored for quality control with the help of premier institutions including IIT Bombay, along with Original Equipment Manufacturers (OEMs), ensuring adherence to the highest standards of quality and safety https://www.nseindia.com/.

The 343 km long, access-controlled six-lane Bengaluru–Kadapa–Vijayawada Economic Corridor has been designed for safe, high-speed, and scenic travel experience. It features 17 interchanges, 10 wayside amenities, 5.3 km long tunnel and around 21 km long section of the corridor passes through forest area.

Delivering substantial economic and logistical benefits, once completed the corridor will reduce travel distance by 100 km from current 635 km to 535 km and cut travel time by nearly four hours from the current twelve hours to around eight hours. The corridor will significantly enhance regional connectivity by linking Bengaluru with Vijayawada, strengthening access between the Rayalaseema region and the coastal and northern regions of Andhra Pradesh, as well as the Koparthy Industrial Node https://sbi.com.in/.

These Guinness World Records stand as a testament to NHAI’s commitment to deliver world-class National Highway infrastructure, aligned with the vision of the Government of India to build safe, efficient, and globally benchmarked corridors that support economic growth and regional development across the country. Fiinews.com

Tags: MoRTH
ShareTweetShare

Related Posts

MNRE
Projects

Project: 266.78 GW non-fossil fuel capacity added

by Fiinews
January 12, 2026
0
17

Large hydro power capacity stood at 50.91 GW in 2025 India has installed 266.78 GW of non-fossil fuel capacity, marking...

DRDO
Projects

Project: DRDO tests Hypersonic Missiles

by Fiinews
January 11, 2026
0
15

Cruise Missile capable of exceeding 5X speed of sound The Defence Research & Development Laboratory (DRDL), the Hyderabad-based laboratory of...

IDE

Project: IDE to work on SIPCOT SWRO plant

January 8, 2026
17
Samudra pratap

Project: GSL-built Samudra Pratap commissioned

January 7, 2026
18
PIB

Project: Palghar tunnel done for Bullet Train

January 5, 2026
19
PIB

Projects: Developments show engineering strength

January 1, 2026
12
SBI YONO

POPULAR NEWS

  • Cristina Dnv

    Projects: Indian yards set to build green ships, says DNV expert

    0 shares
    Share 0 Tweet 0
  • Market: Indian-origin UGF scales heritage consumer brands globally

    0 shares
    Share 0 Tweet 0
  • Technologies: Royal Diamond sponsors aerspace Industries’ drones in UAE

    0 shares
    Share 0 Tweet 0
  • Investments: Foreign investors see India as long-term destination for fund placings

    0 shares
    Share 0 Tweet 0
  • Markets: Blue Dart maintains positive outlook on India

    0 shares
    Share 0 Tweet 0

Fiinews.com features through news articles on business opportunities in the Indian market for the benefits of foreigners. It is also a platform for international businesses to showcase through elaborate articles on their products & services to the Indian consumers and corporations exploiting industrialisation of the country.

7Clicks Media is a Singapore based Media & PR company offering over 100,000
impressions via our targeted communication strategy.

It is led by editor-in-chief Gurdip Singh who has worked over 45 years reporting on
Asian businesses.

Recent News

  • Invest:  BrowserStack works on $125m program
  • Market: ChemWerth expands in India
  • Project: NHAI’s Guiness World Records on NH-544G
  • Market: Sansaar expands to GCC from Dubai
  • Project: 266.78 GW non-fossil fuel capacity added

Pages

  • About US
  • ADVERTISE ON FIINEWS.COM
  • CONTACT US
  • EVENTS
  • FII-NEWS.COM PDF ARCHIVE
  • Home
  • News
  • PRIVACY POLICY

Subscribe to Newsletter

  • About
  • Advertise
  • Careers
  • Contact us

© 2024 FIINEWS - Design and developed by 7clicksmedia.

No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports

© 2024 FIINEWS - Design and developed by 7clicksmedia.