Sunday, November 15, 2026
  • Home
  • About us
  • Privacy policy
  • Advertise with us
  • Contact us
Fii News Logo
No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Newsletter
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Fiinews
No Result
View All Result
Home Projects

Projects: Five bridges being built over Brahmaputra

Fiinews by Fiinews
August 8, 2024
in Projects
Reading Time: 2 mins read
A A
0
IWAI
0
SHARES
24
VIEWS
LinkedinShare on Twitter

NOC issued for bridge connecting Bharalumukh from South to North Guwahati

Five bridges are under construction over the Brahmaputra River, which is part of National Waterway-2, Ports, Shipping and Waterways Minister Sarbananda Sonowal has updated the Rajya Sabha on 6 Aug 2024 shipmin .

The bridges from Dhubri to Sadia, covering a distance of 891-km, over Brahmaputra which was officially declared as National Waterway-2 in September 1988 globaltenders .

The construction of any bridge over a National Waterway necessitates obtaining a “No Objection Certificate” (NoC) from the Inland Waterways Authority of India (IWAI) .

This requirement ensures that the bridges meet the essential parameters related to horizontal and vertical clearances, which are critical for maintaining safe navigation sbi .

According to the Inland Waterways Authority of India (Classification of Waterways in India) Regulations, 2006, as amended in 2016 and 2022, the Brahmaputra River from Dhubri to Dibrugarh is classified as a Class-VII waterway, requiring a minimum horizontal clearance of 100 meters between the two piers and a minimum vertical clearance of 10 meters nse .

The stretch from Dibrugarh to Sadia is classified as a Class-V waterway, requiring a minimum horizontal clearance of 80 meters between the two piers and a minimum vertical clearance of 8 meters bse .

The Minister also confirmed that the NoC for constructing a bridge over the Brahmaputra River, connecting Bharalumukh (South Guwahati) to North Guwahati, was issued by the IWAI on 28th February 2018 to the Guwahati Metropolitan Development Authority (GMDA) globalwaterexhibition .

This clearance ensures that the bridge adheres to the necessary regulations, facilitating the safe and efficient movement of vessels along the waterway, he said conexpoconagg. fiinews.com

Tags: MoPSW
ShareTweetShare

Related Posts

Cochin Shipyard
Projects

Project: INS Betwa to be re-powered

by Fiinews
November 13, 2026
0
18

More than 50 MSMEs to benefit from naval frigate upgrade The Ministry of Defence has signed a contract worth Rs.498.58...

Mazagon Dock Shipbuilders
Projects

Project: Investors to get red carpet treatment

by Fiinews
November 11, 2026
0
19

India’s maritime transformation is not simply an infrastructure story, says Sankar A tripartite agreement signed in Oct 2026 between the...

Amini delivered

Project: Navy takes delivery of ASW SWC Amini

November 8, 2026
26
PIB

Project: Accelerate coal gasification, says Reddy

November 7, 2026
20
PIB

Project: Samsung MoU for industry-oriented skill

November 7, 2026
21
Thakral's Gurugram project.

Project: Thakral leases land to Manipal Health

November 6, 2026
20
SBI YONO

Recent News

  • Tech: Joshi’s call “think beyond boundaries”
  • Market: Drone industry set to grow to Rs.97,300cr
  • Tech: India-Italy implemented 150+ joint projects
  • Market: Indians urged to do global business
  • Export: sustain growth in shipments, says FIOE Chief

Pages

  • About US
  • ADVERTISE ON FIINEWS.COM
  • CONTACT US
  • EVENTS
  • FII-NEWS.COM PDF ARCHIVE
  • Home
  • News
  • PRIVACY POLICY
  • About
  • Advertise
  • Careers
  • Contact us

© 2026 FIINEWS - Design and developed by 7clicksmedia.

No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEAN

© 2026 FIINEWS - Design and developed by 7clicksmedia.